Biomass power plant, Energy Center Pulau Bulan, Indonesia

Biomass power plant, Energy Center Pulau Bulan, Indonesia
Owner's Engineer Design and Studies Installation and Supply Diagnostics

 

 

We provided project documentation for the modification and completion of an unfinished power plant utilizing fast-growing tropical grasses. Subsequently, we supported the investor as the Owner’s Engineer in procurement, construction, assembly and commissioning.

Scope of documentation:

  • Conceptual design
  • Basic design
  • Detail design
  • Commissioning plan
  • Operation and maintenance manuals

BFS Industry activities:

  • Providing documentation for the modification and completion of the power plant
  • Supporting the investor in the procurement of technology and construction works
  • Quality control
  • Supporting the investor during construction and assembly works
  • Coordination of commissioning

“Brownfield” project

Location: Pulau Bulan, Indonesia

Designing: 01/2017 - 05/2017

Procurement, construction and assembly: 04/2017 - 01/2020

Technical specifications of the plant:

  • Fuel: Fast-growing tropical grasses, wood chips, wood dust
  • Electric power output: 4 MWe