Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ | ✓ |
We provided the designing, permitting and construction of new flue gas cooler. The cooler was integrated into the existing technology of the plant. The cooler has increased the CHP plant’s overall efficiency.
BFS Industry activities:
“Brownfield” project
Execution date: 02/2016 - 08/2016
Technical specifications of the cooler: