We developed the basic design and drew up the feasibility study on integrating an electric boiler into existing CHP plant. The electric boiler was meant to provide ancillary services for the transmission system operator.
BFS Industry activities:
Execution date: 06/2015 - 09/2015
Technical specifications of the electric boiler system: