Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ | ✓ | ✓ |
In connection with the project for the implementation of an electric boiler at the Mostek power plant, we arranged for the increase of the power input of the electric boiler and auxiliary systems to 8 MW.
Technical parameters of the project:
Role of BFS Industry in the project:
Location: Mostek