Feasibility study: Implementation of 20 MW steam electric boiler into a CHP plant, Czechia

Feasibility study: Implementation of 20 MW steam electric boiler into a CHP plant, Czechia
Owner's Engineer Design and Studies Installation and Supply Diagnostics
✓

The aim of the feasibility study was to evaluate the possibility of instalation of the steam electrode boiler into a CHP plant. The steam electrode boiler would be used for providing ancillary sevices as well as back-up heat source.

Location: Czechia

Dates of execution: 01/2021 - 04/2021

Technical specifications:

  • Steam electrode boiler output: 20 MW
  • Voltage: 10,5 kV