FEASIBILITY STUDY, TECHNICAL SPECIFICATION, ČEZ POŘÍČÍ POWER PLANT, CZECHIA

FEASIBILITY STUDY, TECHNICAL SPECIFICATION, ČEZ POŘÍČÍ POWER PLANT, CZECHIA
Owner's Engineer Design and Studies Installation and Supply Diagnostics

We prepared a study for implementation of a electric boiler of power output of 30 MW. Various steam and hot water boiler variants were considered. Electric boilers are intended for providing auxiliary services and as a backup heat source into Poříčí power plant.

BFS Industry activities:

  • Implementation of the electric boiler with a power of 30 MW (steam, hot water and combination of these variants were considered)
  • Description of connection points for all media in all considered options
  • Design of HV connection - Proposal of electric boiler operation during plant overhaul
  • Evaluation and proposal of appropriate location of technology with respect to load capacity
  • Evaluation of estimated costs for all variants

Location: Poříčí, Czechia

Execution dates: 09/2018 - 10/2018

Technical specifications:

  • Voltage level: 10,5 kV
  • Electric power input: 30 MW
  • Steam output: 46 t/h - saturated steam, 1,25 MPa(g), feedwater 105°C