FEASIBILITY STUDY, TECHNICAL SPECIFICATION, ČEZ POŘÍČÍ POWER PLANT, CZECHIA
Owner's Engineer |
Design and Studies |
Installation and Supply |
Diagnostics |
|
✓ |
|
|
We prepared a study for implementation of a electric boiler of power output of 30 MW. Various steam and hot water boiler variants were considered. Electric boilers are intended for providing auxiliary services and as a backup heat source into Poříčí power plant.
BFS Industry activities:
- Implementation of the electric boiler with a power of 30 MW (steam, hot water and combination of these variants were considered)
- Description of connection points for all media in all considered options
- Design of HV connection - Proposal of electric boiler operation during plant overhaul
- Evaluation and proposal of appropriate location of technology with respect to load capacity
- Evaluation of estimated costs for all variants
Location: Poříčí, Czechia
Execution dates: 09/2018 - 10/2018
Technical specifications:
- Voltage level: 10,5 kV
- Electric power input: 30 MW
- Steam output: 46 t/h - saturated steam, 1,25 MPa(g), feedwater 105°C