Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ | ✓ |
Design of a photovoltaic power plant system with a capacity of 875 kWp for the own consumption of the heating plant. The photovoltaic system makes maximum use of available roof and ground areas within the heating plant premises. Our company prepared project documentation for the building permit, documentation for contractor selection, and documentation for the subsidy application under the RES+ program. During construction, our company provided technical supervision on behalf of the investor.
Technical parameters of the project:
Role of BFS Industry in the project:
Location: Pribram