STEAM TURBINE GENERAL OVERHAUL, ČÁSLAV, CZECHIA

STEAM TURBINE GENERAL OVERHAUL, ČÁSLAV, CZECHIA
Owner's Engineer Design and Studies Installation and Supply Diagnostics
✓

We coordinate the general overhaul of the steam turbine (inc. gearbox and generator).

BFS Industry activities:

  • Owner's Engineering
  • Procurement
  • Coordination of suppliers

Location: Čáslav, Czechia

Execution: 11/2019 - ongoing

Technical specifications:

  • Steam turbine electrical power: 5 740 kW
  • Admission steam pressure: 62 bar(a)
  • Admission steam temperature: 480 °C