Hot water biomass boiler plant 8 MWt (Technical Supervision by the Client - TDI)

Hot water biomass boiler plant 8 MWt (Technical Supervision by the Client - TDI)
Owner's Engineer Design and Studies Installation and Supply Diagnostics

Provision of technical supervision by the client for the construction of a hot water biomass boiler plant with a capacity of 8 MWt.

Technical parameters of the project:

  • Thermal output: 8 MWt
  • Fuel: wood and forest chips

Role of BFS Industry in the project:

  • Technical supervision on behalf of the client