We prepared a study addressing the technical and legislative aspects of the installation of a 12 MW airboiler system for installation at the Energo Příbram premises for the provision of transmission system ancillary services. It was also about the formulation of CAPEX and OPEX, a simplified comparison with the hot water electric boiler's option and recommendations for further steps in the project, including an economic evaluation of the return of individual options.
BFS Industry activities:
Location: Příbram, Czechia
Study development: 06/2022 - 07/2022
Technical specifications: