Implementation study of steam reducing turbine into CHP plant, Mostek, Czechia
Owner's Engineer |
Design and Studies |
Installation and Supply |
Diagnostics |
|
✓ |
|
|
Our company prepared an implementation study of steam reducing turbine into the CHP plant cycle in Mostek, Czechia.
The study can be used as:
- a foundation for a feasibility study
- a input document for designing
BFS Industry activities:
-
Identification of considered options
-
Thermodynamic cycle calculation
-
Evaluation of 4 different variants of driven agregates (pumps and fans)
-
Recommendation of the following actions
Location: Mostek, Czechia
Execution dates: 07/2020 - 09/2020
Technical specifications: