ELECTRIC BOILER, MVM ÉSZAK-BUDAI POWER PLANT, Budapest, HUNGARY

ELECTRIC BOILER, MVM ÉSZAK-BUDAI POWER PLANT, Budapest, HUNGARY
Owner's Engineer Design and Studies Installation and Supply Diagnostics

We provided the design and supplied the technology of an electric boiler. The electric boiler is used for providing ancillary services for the transmission system operator.

BFS Industry activities:

  • Designing project documentation
  • Supply of the technology
  • Construction supervision
  • Commissioning

Location: Budapest, Hungary

Boiler construction: 03/2018 - 01/2019

Technical specifications of the boiler:

  • Voltage level: 10,5 kV 
  • Electric power input: 30 MW 
  • Primary circuit flow: 900 m3/h