GENERAL OVERHAUL OF ELECTROSTATIC PRECIPITATOR IN BIOMASS CHP PLANT ČÁSLAV, CZECHIA

GENERAL OVERHAUL OF ELECTROSTATIC PRECIPITATOR IN BIOMASS CHP PLANT ČÁSLAV, CZECHIA
Owner's Engineer Design and Studies Installation and Supply Diagnostics

We coordinated the general overhaul of electrostatic precipitator (ESP) which ensures fluegas cleaning of CHP plant incinerating woodchips. We performed services as an Owner´s engineer for plant's Owner and operator - LESS & TIMBER, a.s.

BFS Industry activities:

  • Planning the scope of general overhaul of ESP
  • Coordination of procurement of supplier
  • Supervision and coordination of assembly works

Location: Čáslav, Czechia

Construction dates: 04/2018 - 08/2018

Technical specifications of the ESP:

  • ESP consists of 2 sections and 2 HV units 
  • Fluegas temperature: 140 °C