Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ | ✓ |
We provided the design and construction of water supply pipeline and sewage connection. Project engineering required negotiation with various plot owners and respective parties.
BFS Industry activities:
Location: Kutná Hora, Czechia
Dates of execution: 08/2018 - 01/2019
Technical specifications of the water and sewage connection: