Steam, 20 MW, high-voltage electric boiler, South Moravia, Czech Republic
Owner's Engineer |
Design and Studies |
Installation and Supply |
Diagnostics |
✓ |
✓ |
✓ |
|
Our company:
- prepared the documentation for the building permit,
- prepared the detail design documentation for the mechanical (piping) part,
- acted as Chief Project Engineer, coordinating the designers of the LV electrical, HV electrical, civil, and mechanical parts,T
- took on the role of Project Manager for the general contractor,
- provided construction engineering services (permitting),
- carried out technology commissioning,
- programmed the automatic control of the technology in Simatic PLC.
Technical parameters of the project:
- Electric input of the boiler: 20 MW
- Boiler voltage: 6.3 kV
- Steam overpressure in the boiler: 1.6 MPa
- Certified ancillary services: aFRR, mFRR