We developed project design documentation for realization in all relevant professes (technology, civil, electric HV, LV and I&C) for steam electric boilers 2x30 MW with heat storage 1.000 m3 for the ancillary services and as the backup heat source.
BFS Industry activities:
- Integration of two steam electric boilers into the Mělník powerplant (all current and future sources were considered)
- Designing project documentation for realization
- Preparation of itemized budget of project realization
- Preparation of time schedule for the project realization
- Drafting of test plan for the steam boiler
Location: Mělník, Czechia
Documentation: 05/2022 - 12/2022
Technical specifications:
- Voltage: 10,5 kV
- Electric Power: 60 MW (2 x 30 MW)
- Steam Power: 92 t/h (2 x 46 t/h) - saturated steam, 1,7 MPa(g), feed water 105°C
- Heat storage: 1.000 m3 (4x250 m3), 130 °C, PN16