Heat storage system, Riga CHP-2 plant, Latvia
| Owner's Engineer |
Design and Studies |
Installation and Supply |
Diagnostics |
|
✓ |
|
|
We developed the preliminary design of a heat storage system integrated into Riga CHP-2 plant in Latvia. The CHP plant consists of two CCGT units and five hot-water boilers and supplies heat into the district heating system of Riga.
BFS Industry activities:
- Optimization of the storage capacity and charging/discharging power in three variants
- Elaboration of preliminary design
- Calculation of expected revenues, CAPEX and OPEX
Execution date: 10/2017 - 01/2018
Technical specifications of the storage system:
- Water volume: 17,800 m3
- Charging/discharging power: 150 MWt
- Capacity: 550/1000 MWh
- Atmospheric type
- Temperature difference 95/67 °C
- CHP plant total electric power output: 832 MWe
- CHP plant total heat output: 1124 MWt