Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ |
Our company designed the basic concept and further prepared the documentation at the building permit stage, as well as the CAPEX and OPEX assessments for the project. The project involves the installation of 2 × 1.25 MWe membrane electrolyzers and related facilities for hydrogen production, storage, and distribution. The project also includes the capability for providing both positive and negative ancillary services using the electrolyzers.
Technical parameters of the project:
Role of BFS Industry in the project: