Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ |
We developed the conceptual design and drew up a feasibility study on integrating heat storage system into the CHP plant. The CHP plant supplies heat into the district heating system of the town Kladno and several industrial companies.
BFS Industry activities:
Execution date: 05/2016
Technical specification of the storage system: