Ancillary services (aFRR+) at the heating plant site

Ancillary services (aFRR+) at the heating plant site
Owner's Engineer Design and Studies Installation and Supply Diagnostics

Our company prepared the documentation for the building permit, obtained statements from the relevant authorities, secured the building permit, and also prepared the documentation for contractor selection. The project involves the installation of 2 × 1 MWe diesel generators for providing ancillary services.

Technical parameters of the project:

  • Electric output: 2 × 1 MWe
  • Output voltage: 10.5 kV

Role of BFS Industry in the project:

  • Design