Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ | ✓ |
We coordinated the design process and assisted during installation and commissioning of feed water pump in biomass CHP plant. We provided the design and strength recalculation of the new high pressure pipelines.
BFS Industry activities:
“Brownfield” project
Execution date: 12/2017 - 01/2018
Technical specifications of the pump: