Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ | ✓ |
Our affiliated company, BFS Energo, a.s., provided the designing, permitting and construction of the main hot water heating pipeline. The main hot water pipeline supplies heat energy from the CHP plant into the main district heating system station.
BFS Energo activities:
Construction: 08/2013 - 09/2014
Technical specifications of the station: