Owner's Engineer | Design and Studies | Installation and Supply | Diagnostics |
---|---|---|---|
✓ |
We analyzed the possible approaches to low summer loads affecting existing CHP production and the district heating system.
BFS Industry activities:
Identifying and analyzing possible solutions to cover minimum summer heat loads of the local DHS.
Execution date: 10/2015 - 12/2015
Technical specifications of the CHP plant: