BACKUP OIL BOILER - 2ND PHASE, POŘÍČÍ, HODONÍN, CZECHIA

BACKUP OIL BOILER - 2ND PHASE, POŘÍČÍ, HODONÍN, CZECHIA
Owner's Engineer Design and Studies Installation and Supply Diagnostics

We designed documentation for two new emergency oil boilers implementation into existing CHP plant in Poříčí. The designed proposal allowed one of the boilers to be urgently transported into CHP plant Hodonín.

Documentation contained:

  • layout
  • connection points and corridors (oil, steam, feedwater, electricity, flue gas)
  • existing stack recalculation
  • emergeny plan for urgent transport of one of the boilers

Locations: Poříčí and Hodonín, Czechia

Dates of execution: 04/2020 - 07/2020

Technical specificatios:

  • Two boilers OKP 25
  • Boiler's nominal steam output: 2 x 25 tph
  • Nominal steam pressure: 1,4 MPa(a)
  • Nominal steam temperature: 220 °C
  • Fuel: Heating oil