Preparation of Documentation for Building Permit: Project for 2 Electric Boilers, Each 25 MW Including Emergency Cooling

Preparation of Documentation for Building Permit: Project for 2 Electric Boilers, Each 25 MW Including Emergency Cooling
Owner's Engineer Design and Studies Installation and Supply Diagnostics

Our company prepared the documentation for the building permit for the project of two electric boilers, including emergency cooling of the thermal output. The project was suspended due to unresolved property rights issues concerning the affected land plots.

Technical parameters of the project:

  • Planned installed thermal output: 2 × 25 MW
  • Planned cooling capacity: 50 MW
  • Electric input voltage of the electric boilers: 22 kV
  • Primary circuit medium: boiler water
  • Cooling circuit medium: glycol